In close co-operation with Heerema Marine Contractors, the on-site OMC Towmaster is moving a 460ft barge in and out several ports on the Taiwanese coast for loading of piles. The piles itself will be installed on the Greater Changua windfarm project offshore Taiwan.
The tug involved in the barge operations is the 102 tbp AHT MAGELLAN 1 with local harbour tugs assisting during the harbour manoeuvres.